Short answer: Before signing for a new home that is still being built in El Paso or Horizon City, confirm which contract controls, attach complete construction documents, put every change order in writing, understand the completion and closing dates, preserve inspection access, and compare any builder-lender incentive against other Loan Estimates. The current Texas Real Estate Commission form for an unfinished new home is New Home Contract (Incomplete Construction), Form 23-20, effective July 1, 2026.

Published by Casa By Owner for new-construction buyers in El Paso, Horizon City and the Fort Bliss area. Updated November 15, 2026.

Illustration of a new home under construction with building materials and workers
Illustration: a new-home purchase should connect the signed contract to the plans, specifications, finish schedules, allowances and written change orders.

Which Texas contract applies to an unfinished new home?

The Texas Real Estate Commission identifies Form 23-20 for a new home where construction has not been completed by the builder. TREC separately lists Form 24-20 for completed new-home construction and Form 20-19 for a resale. All three current forms have an effective date of July 1, 2026.

The name of the form matters because an unfinished-home transaction includes construction details that do not exist in a typical resale. A builder may also present exhibits, warranty documents, community rules, lender disclosures or other addenda. Buyers should read the entire package and obtain legal advice when a builder-specific provision changes rights or creates uncertainty.

What should be included in the construction documents?

Paragraph 7B of TREC Form 23-20 defines the construction documents to include the plans and specifications, finish-out schedules, change orders and allowances connected to those materials. The form says the parties sign those documents and incorporate them into the contract by reference.

Before signing, a buyer should make sure the documents identify the promised home rather than rely only on a model-home tour or sales conversation. Depending on the transaction, the package may address:

  • Floor plan, elevation and structural options.
  • Exterior materials, roof, windows and doors.
  • Cabinets, counters, flooring, plumbing fixtures and appliances.
  • Electrical, lighting, low-voltage and smart-home features.
  • Heating, cooling, insulation and energy-related specifications.
  • Landscaping, irrigation, fencing, driveway and lot improvements.
  • Allowances, upgrade prices and selection deadlines.

If a feature matters, identify it in the signed documents. Marketing images, model homes and verbal statements may show options that are not included in the base price.

How do change orders and allowances affect the price?

Under Paragraph 7C of Form 23-20, change orders must be in writing. The contract includes a space to state how the buyer will pay cost increases caused by change orders or selections above the agreed allowances. It also says decreases caused by change orders and unused allowances reduce the sales price, subject to proportionate financing adjustments required by the lender.

A buyer should not approve an upgrade until the written change order states:

  • The exact product, finish or plan revision.
  • The added or reduced price.
  • Whether payment is due immediately or at closing.
  • Whether the amount is refundable if the transaction does not close.
  • Whether the change affects the completion date, appraisal or financing.
  • Who signs and how the change becomes part of the contract.

Keep one organized file containing the original specifications and every later revision. That record is useful during inspections, appraisal, the final walkthrough and warranty follow-up.

What does the contract say about buyer selections?

Paragraph 7D allows the construction documents to provide for buyer selections and includes a blank for the deadline after the builder gives notice. The selections must meet the seller's stated standards and may not, in the seller's judgment, adversely affect marketability.

Missing a selection deadline can limit available choices or cause delays under the builder's documents. Buyers should calendar cabinet, flooring, paint, fixture and appliance deadlines separately and obtain written confirmation of each accepted selection.

How is substantial completion defined?

Form 23-20 includes blanks for the date construction must begin and the date the improvements must be substantially complete and ready for occupancy. It defines the substantial completion date as the point when applicable governmental authorities and any lender have completed final inspection and approval.

The form also addresses specified delays and permits substitution of materials, equipment and appliances of comparable quality when applicable. Buyers should review the exact completion language, any outside closing date and every extension provision before relying on a move date, lease termination or military reporting schedule.

A projected completion date is not the same as a guaranteed move-in date. Fort Bliss households, renters and buyers selling another property should keep a backup plan until closing and funding are confirmed.

Can an El Paso buyer inspect a home while it is being built?

Paragraph 7A says the seller will permit the buyer and the buyer's agents access at reasonable times and allows inspections by inspectors selected by the buyer who are licensed by TREC or otherwise permitted by law. That does not mean the buyer may enter an active construction site without coordination. Follow the builder's safety and scheduling procedures.

Buyers often discuss inspection timing with their inspector based on the construction stage. Possible review points include pre-drywall, near completion and the final walkthrough. The appropriate scope depends on the home, access, contract and inspector's services.

Casa By Owner's new-construction final walkthrough checklist explains how to document incomplete or damaged items before closing.

What warranties should the buyer receive?

Paragraph 7F says that, except for warranties expressly stated in the contract, a separate writing or law, the seller makes no other express warranties. It also requires the seller to assign all assignable manufacturer warranties to the buyer at closing.

Before closing, request the actual written warranty package and confirm:

  • Coverage periods for workmanship, systems and structural items.
  • Exclusions, maintenance duties and required notice methods.
  • Where and how warranty claims must be submitted.
  • Whether disputes are subject to mediation or arbitration.
  • Which manufacturer warranties will be transferred.
  • Whether a third-party warranty administrator is involved.

A home warranty or residential service contract is different from the builder's construction warranty and from homeowners insurance. Read each document for its own coverage and exclusions.

What if a construction defect appears after closing?

Chapter 27 of the Texas Property Code addresses residential construction defect claims. Among other provisions, it generally requires detailed written notice to the contractor by certified mail at least 60 days before a claimant files suit or initiates arbitration, and it gives the contractor an opportunity to inspect and respond. The statute and the signed contract can affect deadlines, procedure and remedies.

Document the issue with dates, photographs, reports and communications. Follow the warranty claim procedure promptly. If the defect is disputed, significant or approaching a deadline, consult a Texas attorney rather than relying on general online guidance.

Should a buyer use the builder's preferred lender?

A builder may offer a credit or incentive tied to an affiliated or preferred lender, but the Consumer Financial Protection Bureau states that a new-construction buyer does not have to use the builder's associated lender and has the right to shop for a better deal.

Compare Loan Estimates issued close together and for the same loan type, loan amount and lock assumptions. CFPB guidance recommends comparing the interest rate, monthly payment, mortgage insurance, origination charges, lender credits, cash to close and five-year borrowing cost. A large headline credit may be offset by a higher rate or other charges.

Ask each lender to show the scenario both with and without discount points or credits. Also confirm that the lender can meet the builder's construction and closing timeline.

How should buyers evaluate the builder deposit?

The CFPB advises buyers of homes that are not yet built to ask when an upfront builder deposit or earnest money is refundable. The current TREC new-home form includes earnest-money and option-fee provisions, but the actual contract and builder documents control the amounts, deadlines and remedies in the transaction.

Before paying, verify the named escrow agent, accepted payment method, delivery deadline, refund conditions and treatment of upgrade deposits. Confirm wire instructions through an independently obtained phone number and keep the escrow receipt.

For the general Texas earnest-money timeline, read Casa By Owner's earnest money and option fee deadline guide.

What other new-construction costs need attention?

The contract price is not the buyer's full ownership cost. Review:

  • Property taxes and whether the current estimate reflects only vacant land or partially completed improvements.
  • Homeowners insurance availability and estimated premium.
  • HOA assessments, transfer charges and community restrictions.
  • Public improvement district, utility district or other special assessments when applicable.
  • Window coverings, appliances, fencing, landscaping and other items not included.
  • Utility setup, internet availability and recurring service charges.
  • Closing costs, prepaid items and lender-required reserves.

Use the disclosures and title commitment for the actual property. Do not assume every El Paso or Horizon City subdivision has the same costs or restrictions.

What should a buyer do before signing?

  1. Identify the correct contract and every addendum. Confirm whether the home is incomplete, completed or a resale.
  2. Attach complete construction documents. Match the plan, elevation, lot, selections, allowances and included features.
  3. Review deposit and option terms. Know delivery deadlines and refund conditions.
  4. Confirm financing protections. Review the financing addendum, appraisal provisions and closing timeline.
  5. Compare lender offers. Measure the builder incentive against complete Loan Estimates.
  6. Protect inspection access. Coordinate safe access and inspection stages in writing.
  7. Calendar selections and completion dates. Track notice requirements and possible extensions.
  8. Read the warranty and dispute provisions. Obtain legal review of terms you do not understand.

Frequently asked questions about unfinished new homes

Is Form 23-20 the same as a resale contract?

No. TREC Form 23-20 is designed for a new home whose construction is incomplete. It includes provisions for construction documents, change orders, selections, completion and warranties that are not the same as the resale form.

Can the builder substitute materials?

Form 23-20 permits substitution of materials, equipment and appliances of comparable quality under its completion provision. Buyers should compare any proposed substitution with the signed specifications and request written documentation.

Does a city inspection replace an independent inspection?

No. Governmental approval and a buyer's independent inspection serve different purposes. The contract separately addresses substantial completion approval and the buyer's right to use a qualified inspector.

Are builder upgrades automatically included in the appraisal?

No. The appraiser evaluates the property under the lender's requirements. Give the lender and appraiser accurate contract, option and upgrade information, and confirm how nonrefundable upgrade payments affect financing.

Can the buyer choose another lender and keep the incentive?

That depends on the written incentive terms. A buyer may shop for another lender, but a credit tied to the builder's preferred lender may not transfer. Compare the full cost of both options.

Should the buyer close with unfinished punch-list items?

Review the contract, lender requirements, governmental approval and the builder's written completion plan before agreeing. Material unfinished work, disputed items or unclear escrow arrangements may require legal advice.

Plan an El Paso new-home purchase with clear documents

Casa By Owner helps buyers compare new homes, builder incentives, contract dates and inspection steps in El Paso, Horizon City and communities near Fort Bliss. Explore new construction homes in El Paso, review new homes in Horizon City 79928, or use the El Paso Home Buyer Guide to organize your purchase.

This article provides general real estate information, not legal, tax, lending, engineering or inspection advice. Contract rights depend on the signed documents and facts. Consult qualified professionals for your transaction.

Authoritative sources